Client: Go-Develop
Project Value: £0.3 million
Location: Luton
Previously Active had installed a temporary works structure to retain the front façade on this project, which then allowed the demolition works to commence. Over a 14-month period Active progressively reduced the site from a 4 storey structure to decrease the site level by 3m with works consisting of a combination of soft strip, asbestos removal, façade retention and full demolition.
Active were later requested to return to site to remove the temporary works structure once the concrete slabs of the new building had been installed behind the retained facade. Active released the framework level by level assisted by the onsite tower crane in coordination with cutting and breaking window openings and installing steel lintels. Active utilized its tracksaw and brokk 100 to create the openings as the steel framework was dismantled.
As well as sequencing window openings and steel framework removal, Active also used its Doff steam cleaning capabilities to steam clean the retained façade as works progressed down the building
Midlands Head Office
Phone: 01582 667000
Email: info@active-groupuk.com
South East Office
Phone: 01959 569946
Email: info@active-groupuk.com
Greater London Office
Phone: 01582 667000
Email: info@active-groupuk.com
© 2020 Active Enviro All Rights Reserved