SCOPE OF WORKS

  • Isolate utility services
  • Soft strip all internal areas
  • Removal of asbestos materials to building soffit
  • Scaffold installation to wrap building
  • Waterproof first floor level to protect ground floor from water ingress
  • Roof and chimney removal by hand
    Demolition of first and second floor levels by hand

CLIENT

Client: Parkgate Properties
Project Value: £130,000
Location: Wimbledon, North London

    PROJECT SUMMARY

    The project consisted of soft strip and demolition of the first and second floor accommodation levels whilst leaving the ground floor retail outlet in situ. The building was scaffold wrapped, with asbestos soffits removed under controlled condition and the first-floor slab level waterproofed to provide protection from water ingress.

    Midlands Head Office
    Phone: 01582 667000
    Email: info@active-groupuk.com

    South East Office
    Phone: 01959 569946
    Email: info@active-groupuk.com

    Greater London Office
    Phone: 01582 667000
    Email: info@active-groupuk.com

    © 2020 Active Enviro All Rights Reserved